Took a day to renew a shower with modern 200x400mm tiles to replace dated looking ones. The owner had already done the wall preparation and the walls were straight and level which was nice. If prep work is done it needs to be done right otherwise it makes my job harder and it would be better if I do it myself. The general rule is check your level. If things like walls and floors aren't level or tilts the wrong way then the glue bill and hours mount up. In tiling we deal in millimeters not centimeters. The level Bubble has to be exactly in the middle. In this case it was and all was right in the world.
|
Phone
|