Complete
Laying the tiles
The customer did the wall prep including the waterproofing. I would have liked straighter walls and a few other things.
The floor tiles were a composite terrazzo type tile about 20mm thick so a common score and snap cutter wasn't up to the job, it required a wet saw. The floor was laid in two parts, first the entrance and then the walk in shower area. This had an incline, not from the ensuite doorway side but down from a toilet area that was in the opposite corner from the door. Once these tiles were cut and glued we had all the incline we needed to drain the water into it's square mouthed exit. Tiles were cut on angles to provide the fall from every side.
Then it was simply a matter of putting up the 300 x 600 mm white ceramic wall tiles including the shower box area and Aluminium trim.
The floor tiles were a composite terrazzo type tile about 20mm thick so a common score and snap cutter wasn't up to the job, it required a wet saw. The floor was laid in two parts, first the entrance and then the walk in shower area. This had an incline, not from the ensuite doorway side but down from a toilet area that was in the opposite corner from the door. Once these tiles were cut and glued we had all the incline we needed to drain the water into it's square mouthed exit. Tiles were cut on angles to provide the fall from every side.
Then it was simply a matter of putting up the 300 x 600 mm white ceramic wall tiles including the shower box area and Aluminium trim.