Updated a Kitchen Splashback with a striking modern 100x300mm tile. Completely different look. Matches Bathroom. Roughed up existing tiles with grinder, applied primer and glued new tiles directly over old tiles. Otherwise the wall would have to be replaced with new cement sheet etc.
Bathroom for relocated house on a farm. This was a two day job. Required cement sheet on wooden fibre board floor. This was then nailed, sealed and then tiles could be glued. Most of the tiles were layed on the first day. Just a few around the curved shower were cut and glued on the second day. The Bathroom splashback was done on the first day and the second splashback in the second bathroom was done on the second day (see last photos below). This was a pretty straight forward job. Finally the floor and splashbacks were grouted on the second day. The builder will then be able to put in the skirting board.
|